Budget Monitoring
Moderator: Renato
-
- Developer
- Posts: 1535
- Joined: Sat Dec 06, 2008 2:27 pm
- Are you a spam bot?: No
- Location: Sankt-Petersburg, Russia
Re: Budget Monitoring
http://msdn.microsoft.com/en-us/library ... _emulation
add mmex.exe = (DWORD) 00001101
add mmex.exe = (DWORD) 00001101
-
- Senior User
- Posts: 30
- Joined: Wed Sep 02, 2009 6:47 am
- Are you a spam bot?: No
- Location: Israel
Re: Budget Monitoring
ok, i did that too, still nothing...no data just headers...Nikolay wrote:http://msdn.microsoft.com/en-us/library ... _emulation
add mmex.exe = (DWORD) 00001101
-
- New User
- Posts: 10
- Joined: Mon Jun 11, 2012 5:15 pm
- Are you a spam bot?: No
Re: Budget Monitoring
Hi,
I assume, that you use the latest unstable version svn6475.
In this version the usage of the template variables changed. In the report template I used. The usage of the "name" attribute worked in the former version svn6254. In the latest version it has to be .
Please try, if this fixes your issue.
I assume, that you use the latest unstable version svn6475.
In this version the usage of the template variables changed. In the report template I used
Code: Select all
<TMPL_VAR name="EXPENSE_INCOME_DATA" />
Code: Select all
<TMPL_VAR "EXPENSE_INCOME_DATA" />
Please try, if this fixes your issue.
Kind regards,
nuvito
nuvito
-
- Senior User
- Posts: 30
- Joined: Wed Sep 02, 2009 6:47 am
- Are you a spam bot?: No
- Location: Israel
Re: Budget Monitoring
Tried that too...still the same, headers only, no data is showing
BTW, other reports with graphs are showing OK
BTW, other reports with graphs are showing OK
-
- Senior User
- Posts: 30
- Joined: Wed Sep 02, 2009 6:47 am
- Are you a spam bot?: No
- Location: Israel
Re: Budget Monitoring
HI NUVITO,
YOU WERE RIGHT OF COURSE, NEW VERSION DID FIX THE PROBLEM AND BOTH BUDGET MONITORING REPORTS WORKS JUST FINE. VERY NICE JOB!
TWO COMMENTS THOUGH:
1. THE CURRENCY SYMBOL IS CODED TO SHOW EUROS RATHER THEN THE BASE CURRENCY (MINE IS 'ILS' FOR INSTANCE).
2. ALL CATEGORY LABELS ON THE GRAPH ARE SHOWING GIBBERISH (MINE ARE ALL IN HEBREW) THERE MUST BE A WAY TO HANDLE THAT TOO, FOR ALL OTHER REPORTS LABELS DOES SHOW IN PROPER HEBREW. OK, THIS ONE WAS EASY TO FIX...JUST ADDED " <meta charset="UTF-8" />" TO THE HEADER
MY BEST REGARDS
AVI
YOU WERE RIGHT OF COURSE, NEW VERSION DID FIX THE PROBLEM AND BOTH BUDGET MONITORING REPORTS WORKS JUST FINE. VERY NICE JOB!
TWO COMMENTS THOUGH:
1. THE CURRENCY SYMBOL IS CODED TO SHOW EUROS RATHER THEN THE BASE CURRENCY (MINE IS 'ILS' FOR INSTANCE).
2. ALL CATEGORY LABELS ON THE GRAPH ARE SHOWING GIBBERISH (MINE ARE ALL IN HEBREW) THERE MUST BE A WAY TO HANDLE THAT TOO, FOR ALL OTHER REPORTS LABELS DOES SHOW IN PROPER HEBREW. OK, THIS ONE WAS EASY TO FIX...JUST ADDED " <meta charset="UTF-8" />" TO THE HEADER
MY BEST REGARDS
AVI
-
- New User
- Posts: 10
- Joined: Mon Jun 11, 2012 5:15 pm
- Are you a spam bot?: No
Re: Budget Monitoring
Hi Avi,
I'm glad that the report eventually works for you. I did some tweaks in the template, so that it also should display the gauge charts in the latest release candidate 1.1.0-RC2.
Additionally I removed the hardcoded euro symbol and added the symbol of the specified base currency.
Please find attached the new version of the report. You can also find the new version on github.
I'm glad that the report eventually works for you. I did some tweaks in the template, so that it also should display the gauge charts in the latest release candidate 1.1.0-RC2.
Additionally I removed the hardcoded euro symbol and added the symbol of the specified base currency.
Please find attached the new version of the report. You can also find the new version on github.
You do not have the required permissions to view the files attached to this post.
Kind regards,
nuvito
nuvito
-
- Developer
- Posts: 1535
- Joined: Sat Dec 06, 2008 2:27 pm
- Are you a spam bot?: No
- Location: Sankt-Petersburg, Russia
-
- New User
- Posts: 10
- Joined: Mon Jun 11, 2012 5:15 pm
- Are you a spam bot?: No
Re: Budget Monitoring
Hi Nikolay,
thanks for letting me know. I will check, if I find a fitting replacement library.
thanks for letting me know. I will check, if I find a fitting replacement library.
Kind regards,
nuvito
nuvito
-
- Senior User
- Posts: 30
- Joined: Wed Sep 02, 2009 6:47 am
- Are you a spam bot?: No
- Location: Israel
Re: Budget Monitoring
Thank you very much....was a bit busy but ill sure check it out....nuvito wrote:Hi Avi,
I'm glad that the report eventually works for you. I did some tweaks in the template, so that it also should display the gauge charts in the latest release candidate 1.1.0-RC2.
Additionally I removed the hardcoded euro symbol and added the symbol of the specified base currency.
Please find attached the new version of the report. You can also find the new version on github.
-
- Senior User
- Posts: 30
- Joined: Wed Sep 02, 2009 6:47 am
- Are you a spam bot?: No
- Location: Israel
Re: Budget Monitoring
Great job nuvito! works like a charm...avma wrote:Thank you very much....was a bit busy but ill sure check it out....nuvito wrote:Hi Avi,
I'm glad that the report eventually works for you. I did some tweaks in the template, so that it also should display the gauge charts in the latest release candidate 1.1.0-RC2.
Additionally I removed the hardcoded euro symbol and added the symbol of the specified base currency.
Please find attached the new version of the report. You can also find the new version on github.
-
- New User
- Posts: 11
- Joined: Sun Mar 18, 2012 8:24 pm
- Are you a spam bot?: No
- Location: Brazil
Re: Budget Monitoring
Hi Guys.
I'm trying to use this report but no data is showing, headers only too.
Where can I find dx.chartjs.js, jquery-2.0.3.min.js and globalize.min.js files?
Can somebody send to me, please?
Thanks.
Daniel
I'm trying to use this report but no data is showing, headers only too.
Where can I find dx.chartjs.js, jquery-2.0.3.min.js and globalize.min.js files?
Can somebody send to me, please?
Thanks.
Daniel
-
- New User
- Posts: 11
- Joined: Sun Mar 18, 2012 8:24 pm
- Are you a spam bot?: No
- Location: Brazil
Re: Budget Monitoring
Ok.
I found the files in the web, but the version of jquery is 1.9.1 (jquery-1.9.1.min.js).
So, it was necessary change to this version in template to work.
Now, I can see the graphics but the problem is other.
All Actual Amount are 0. The budget amount information is ok, but the actual amount. (File attached)
Please, I need some help here.
Thank you.
I found the files in the web, but the version of jquery is 1.9.1 (jquery-1.9.1.min.js).
So, it was necessary change to this version in template to work.
Now, I can see the graphics but the problem is other.
All Actual Amount are 0. The budget amount information is ok, but the actual amount. (File attached)
Please, I need some help here.
Thank you.
You do not have the required permissions to view the files attached to this post.
-
- New User
- Posts: 1
- Joined: Wed Jan 06, 2016 8:15 pm
- Are you a spam bot?: No
Re: Budget Monitoring
Hello Evryone,
I am trying to import this report. I can't find library files. Is it possible someone to upload them?
Thanks in advance
I am trying to import this report. I can't find library files. Is it possible someone to upload them?
Thanks in advance
-
- New User
- Posts: 4
- Joined: Thu Jul 14, 2016 7:07 am
- Are you a spam bot?: No
Re: Budget Monitoring
Hellodca_sonic wrote:Ok.
I found the files in the web, but the version of jquery is 1.9.1 (jquery-1.9.1.min.js).
So, it was necessary change to this version in template to work.
Now, I can see the graphics but the problem is other.
All Actual Amount are 0. The budget amount information is ok, but the actual amount. (File attached)
Please, I need some help here.
Thank you.
Did anyone find out the problem with the gauges. I am having the same issue, screen print attached.
Thanks for any input
-
- New User
- Posts: 4
- Joined: Thu Jul 14, 2016 7:07 am
- Are you a spam bot?: No
Re: Budget Monitoring
ImageHello,
I have installed the gauge and get the coloured circle with budget amounts, but the needle pointer stays at zero.
any thoughts on how I can fix this.
Thanks
I have installed the gauge and get the coloured circle with budget amounts, but the needle pointer stays at zero.
any thoughts on how I can fix this.
Thanks
-
- Developer
- Posts: 382
- Joined: Wed Dec 21, 2011 5:58 am
- Are you a spam bot?: No
- Location: China
Re: Budget Monitoring
Lisheng Guan,
Developer of MoneyManagerEX (http://moneymanagerex.org)
Developer of MoneyManagerEX (http://moneymanagerex.org)